Placeholder

How long does it take to install FluidWorker?

Installation of FluidWorker is done in parallel with ongoing machining and takes about 30–60 minutes depending on the model. All FluidWorker units require a 230V power outlet, and FluidWorker 50/150 also need access to water and concentrated cutting fluid.